Setech ST-EG100-E Spécifications Page 20

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 28
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 19
20
Figure 5: Tank Preparation
Drill Holes:
Ensure Water Tank is empty before proceeding.
Drill four (4) Ø10mm holes in Water Tank.
The bottom bung is to be located as close as practical to
the bottom of the tank.
The Top bung is to be located at desired height for 'Tank Full'
Indication, recommended height is ¾ full depth
Ø10mm
(x4 places)
4
1
2
3
1
0
0
1
2
0
R
e
c
o
m
m
e
n
d
e
d
Equal
Equal
Equal
Water Tank
Vue de la page 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Commentaires sur ces manuels

Pas de commentaire